Posts

Showing posts with the label pricing.

Subsea Cable News - SMW6, Mist, 2Africa

Image
Mist delayed due to hard rock at Indian CLS. Construction teams find the rock between the CLS and the beach manhole is too hard for directional drilling. A new path around the rock is required.  SMW6 will only go live in 2026.  APG down 12 months since start of 2023. Cursed cable.  2Africa struggling due to delays in the Northeastern Africa quadrant.  Bifrost behind schedule. Ground breaking on the Jakarta CLS was just in June and just a few days ago for the second CLS. Figure late 2025.  Peace cable is cheap in part because 40% of potential customers will not use it because Chinese companies built and equipped it. . Equiano 10G prices are relatively high because many carriers only offering 100G. There is a dearth of 10G providers.  Anjana and Firmina on schedule because neither cable is a consortium. Consortiums are too slow and make mediocre decisions.  Bay of Bengal Gateway capacity is low and prices rising.  2Africa 100G prices between Mombasa and South Africa are sky high in the $

Equiano: The West African ISP Buyer's Guide

Equiano is a Google cable. A 12 fibre pair spatial division multiplexing system designed to do at least 12 Tbps per pair. This cable is a must-have for African ISPs as it connects the three key telecom hubs of Portugal (Lisbon Equinix (LS1)), Nigeria (the Open Access Data Center (OADC) in Lagos), and South Africa (Capetown Teraco (CT1) in South Africa), has massive capacity and is vastly more reliable than older African cables.  Equiano not only connects the key telecom hubs essential to West Africa's Internet, but is also buried two meters deep and avoids the dangerous undersea areas like the Congo canyon and Le Trou Sans Fin that have caused many subsea outages. Le Trou experienced a debris slide this Spring that caused 4 African cables (SAT3, Mainone, WACS, and ACE) to be severed in the Ivory Coast's territorial waters. Equiano saved West Africa's Internet from a complete subsequent meltdown as its capacity was used to reroute traffic to Lisbon or South Africa. Equiano&#