Peace Cable In A Time Of Scarcity

Image
Route Latency SG/Marseille 136 ms Mombasa/Marseille 104 ms Karachi/Marseille 92 ms Karachi/Signapore 82 ms Kenya/Singapore 93 ms.

Mumbai/Singapore Bay of Bengal Gateway 100G Wave: $38.5K MRC

Image
A point: Most carrier neutral Mumbai data centers. Z point: SG1, Singapore. Term: 1 Year. NRC: $10K.

2x 100G EIG Waves: Djibouti/Marseille

Image
EIG upgrade has been delayed until 2028. Three year MRC: Under $40K for right customer. Life of system I00G wave IRU ~ $1 million. 

Value-Added Terrestrial 100G Waves: Bangkok Telehouse/Singapore

Image
1. All terrestrial route with good outage history and longest outage only 17 hours. Find a subsea cable with a record that good. 2. Three year MRC: $26.5K MRC.

Equiano Cable Buyer Feeding Frenzy: Buy Now Or Forever Regret!!!

Image
LS1/CT1; $17,500 MRC; Two year term. LS1/OADC; $17,500 MRC; Two year term.

The Second Half Petabit Trans-Atlantic Cable: META's US/Denmark Aurora Cable Project

Image
Facebook's subsea cable subsidary, Edge Cable Holdings, has petitioned the FCC to land a new cable at the NJIX data center in Wall Township, New Jersey. The cable lands in Europe at an Arelion owned facility in Blaabjerg, Denmark. META uses both NJIX and the Arelion facility for the power feed equipment, but is installing the submarine line termination equipment, which includes the lasers and electronics at a Piscataway carrier neutral data center and its Danish counterpart, an unnamed Esbjerg site. There are two huge data centers in Esbjerg. Facebook currently owns two fiber pairs on the consortium AEC-2 subset network linking the US and Denmark. AEC-2 has exactly the same end points as Aurora. Hyperscaler traffic has grown so rapidly that consortium membership in many cases simply makes no economic sense. Most hyperscalers need all the capacity that a cable provides and hence sole ownership as emerged as the most economic business model. We know very little about A...