Meta's Waterworth Update

1. The Waterworth cable will link the US to South Africa with a branching unit to Brazil. It extends from South Africa to India & onto to the Pacific and the US. The total length is greater than the Earth's circumference at approximately 50,000 kilometers. 2. Subsea cable projects are taking 3 to 5 years from initial idea to commercial service. 3. US traffic goes to Europe. It's aggregated with European originated traffic and then traverses the Mediterranean Sea to reach Egypt and takes terrestrial routes (Telecom Egypt) to the Red Sea. Then the traffic flows down the Red Sea. From there it either heads to India or bypasses it with Southeast Asia being the destination. 4. In the eyes of Facebook's subsea engineering team, the standard cable routing described above creates a host of problems. First of all , the Red Sea is a single point of failure. Same holds for Egypt. Secondly, the Mediterranean Sea requires many government permits as cables inevitably goes through ter...