Posts

Showing posts with the label capacity shortage

The Pacific Rim Triangle Capacity Crunch

Image
Layer 1 bandwidth is increasingly tight in the Pacific Triangle consisting of Tokyo, Hong Kong, and Singapore. In particular, many carriers' spare ADC capacity is completely gone. Whole fibre pairs are exhausted. Most older cables like SJC are maxed out. Even SJC2 is mostly gone. A large number of resellers is compounding the bandwidth misery by demanding 100G pricing in the $9K to $12K range. This is absurd and not happening. I know of 3x ADC 100G waves available on the Tokyo/Singapore route. One year contracts only. Non-Chinese carrier and equipment. Demarcation points are SG1 and Maruyama CLS. MRC is an inexpensive $13.7K. Don't be a fool and shop this price because this is the network operator's offer, not a resale by me. I don't resale. I take you to the Source (like the Machine Main Frame in the Matrix film series). There is one SJC2 100G wave available for contract early February. SG3/CC1. Available on a 3 year contract at $13.5K MRC plus a $10K install. One SJC...

Lessons From 2026 ITW Africa Conference In Nairobi

Image
1. Hyperscalers are worried that a capacity shortage will materialize two or three years down the road due to robust traffic growth and the absence of any major subsea cable project in the pipeline. Their network investment teams are studying the issue. 2. 2Africa is bypassing the Red Sea by building Northeast African routes that will connect either Mombasa to the Sudan 2Africa CLS in the Red Sea or a route from Djibouti to the same CLS. Decision has not yet been made. 3. 2Africa from Mombasa to Marseille should be live next summer. This will bring relief to carriers and ISPs alike. 4. Africa-1 project is struggling and may be out of funds. 5. Mombasa is the subsea cable hub, but Nairobi is the data center for Kenya. 6. Excess capacity on Equiano and 2Africa exists and ISPs should stock up before the Telecom Winter arrives.