Although most subsea cables with Singapore POPs land at Singapore, some do not, and these exceptions are the keys to better uptime for your Layer 1 network.
Five
fibre pair AAE1 lands at a Penang, Malaysia CLS that has a fully
diverse fibre ring for automatic route protection into Singapore. Each
side of the fibre ring uses a separate bridge to cross the
Malaysian/Singapore border. One side of the ring terminates at the older
of the two Global Switch data centers and the other at SG3. So AAE1
neither lands at Singapore nor uses any of the Singapore cable landing
stations. This is one reason why AAE1 is a 'must' for network capacity
buyers. Other reasons include low latency for the Marseille/Singapore
end points and relatively good pricing due to the system's high
capacity.
Bay
of Bengal Gateway also lands in Penang, Malaysia, but my understanding
is that it and AAE1 use different cable landing stations. However, I
have not seen backhaul maps so I cannot claim the respective terrestrial
routes are completely diverse all the way into Singapore. I will update
the readers on this point shortly.
Obviously,
AAE1 should be part of any network linking Marseille to Singapore.
Similarly, BBG is an essential ingredient for Layer 1 networks that link
either the Middle East via Oman Dubai or India to Singapore.